Explanation of this Animation
The truck unloads the raw material on a conveyer belt which is sent upwards to the elevator. The raw material is then fed to the Hammer mill which crushes the raw material to the required size and then is distributed to different bins. The levels of this bins indicated with pink lines rising and falling plays a critical role in deciding which bin is full and which should be emptied before it gets over/under filled.
Instrumentation Pro
No comments:
Post a Comment